香蕉视频直播

Skip to content

RCMP clear Coastal GasLink pipeline blockade

Mounties arrest 14 people who are scheduled to appear in court this afternoon
27230299_web1_211125-SIN-houston-rcmp-deployment-houston-coastal-gaslink-site-lamprey-creek_1
Aerial view of damage to Morice Forest Service Road and Lamprey Creek Bridge. (Coastal GasLink photo)

The RCMP have cleared a blockade on the Morice Forest Service Road near Houston that had 500 Coastal GasLink (CGL) workers stranded since Sunday, according to the company.

The Mounties confirmed last night they arrested 14 people in the process, who were taken to the RCMP detachment in Houston and are scheduled to appear before the Supreme Court this afternoon (Nov. 19).

Yesterday, the RCMP said they were deploying a 香蕉视频直播渕arked increase in police resources香蕉视频直播 in the Houston area in response to the blockade that had been set up over the weekend by members of the Gidimt香蕉视频直播檈n clan of the Wet香蕉视频直播檚uwet香蕉视频直播檈n and supporters.

An earlier Facebook post on the Gidimt香蕉视频直播檈n Checkpoint page stated 30 - 50 officers arrived in Smithers Nov. 17. Black Press Media has not been able to confirm the size of the force that was deployed.

香蕉视频直播淭he road into our yintah remains blocked by RCMP at 28km, with hereditary chiefs, food, and medical supplies being turned away,香蕉视频直播 the Facebook post stated.

香蕉视频直播淚n the middle of a climate emergency, as highways and roads are being washed away and entire communities are being flooded and evacuated, the province has chosen to send busloads of police to criminalize Wet香蕉视频直播檚uwet香蕉视频直播檈n water protectors and to work as a mercenary force for oil and gas.香蕉视频直播

Police said the blockade was illegal and preventing Coastal GasLink pipeline workers from leaving and critical supplies from getting in.

香蕉视频直播淲e have serious concerns that a number of individuals from out of province and out of country have been engaging in illegal activities in the area such as falling trees, stealing or vandalizing heavy machinery and equipment, and causing major destruction to the forestry road, all in an effort to prevent industry and police from moving through香蕉视频直播 said RCMP Chief Superintendent John Brewer, gold commander of the Community-Industry Response Group in a press release.

Coastal GasLink said in an earlier statement the forest service road and Lamprey Creek bridge have been significantly damaged.

香蕉视频直播淚t has now been three days and supplies, including water, are at risk of running out and access to medical care in the event of an emergency continues to be obstructed,香蕉视频直播 the statement said.

blockade video

The group of blockaders say they were enforcing an eviction notice issued by the Wet香蕉视频直播檚uwet香蕉视频直播檈n hereditary chiefs in January 2020.

Gidimt香蕉视频直播檈n spokesperson Sleydo香蕉视频直播, who also goes by the English name Molly Wickham, said the court-ordered injunction has no authority on their land.

香蕉视频直播淭hey are trespassing, violating human rights, violating Indigenous rights and, most importantly, they are violating Wet香蕉视频直播檚uwet香蕉视频直播檈n law,香蕉视频直播 she said in a video shared online.

Following the arrests, the Gidimt香蕉视频直播檈n Checkpoint issued a media release stating the 香蕉视频直播淐oyote Camp,香蕉视频直播 which was set up on the CGL proposed drilling site, remains in place.

香蕉视频直播淚f TC Energy (CGL parent company) thinks that raiding Wet香蕉视频直播檚uwet香蕉视频直播檈n territory will stop the resistance against this project, they香蕉视频直播檙e dead

wrong,香蕉视频直播 said Sleydo香蕉视频直播.

Another Facebook post said they will never give up the fight and called for 香蕉视频直播渂oots on the ground on every piece of infrastructure.香蕉视频直播

香蕉视频直播淕o to your local RCMP detachments, tell them to keep their hands off the Wet香蕉视频直播檚uwet香蕉视频直播檈n,香蕉视频直播 it said, adding there would be a gathering at the courthouse in Smithers today (Nov. 19).

Meanwhile, the elected Wet香蕉视频直播檚uwet香蕉视频直播檈n First Nation (formerly the Broman Lake Indian Band) council, which signed on to the pipeline project along with other elected band councils, distanced itself from the protesters. A press release stated the protesters did not consult with them before blocking the road and their actions 香蕉视频直播渃an香蕉视频直播檛 claim to represent the members of the Gidimt香蕉视频直播檈n or any others in the First Nation.香蕉视频直播

READ MORE:

READ MORE:

In both 2019 and 2020, conflict over the pipeline escalated when RCMP enforced B.C. Supreme Court injunctions issued to Coastal GasLink and arrested project opponents.

Last year, the conflict kicked off nationwide protests that stopped railways and put a spotlight on Indigenous rights and jurisdiction.

Talks between the federal government and Wet香蕉视频直播檚uwet香蕉视频直播檈n hereditary chiefs to ease the tensions are ongoing.

-with files from the Canadian Press



editor@interior-news.com

Like us on and follow us on

27230299_web1_copy_211125-SIN-houston-rcmp-deployment-houston-coastal-gaslink-site-PUSH_1


Thom Barker

About the Author: Thom Barker

After graduating with a geology degree from Carleton University and taking a detour through the high tech business, Thom started his journalism career as a fact-checker for a magazine in Ottawa in 2002.
Read more



(or

香蕉视频直播

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }